Projects



The most important capital projects that have been completed during the year 2023:

Completion of construction and upgrading of (22) fuel stations throughout the Kingdom.

Design, supply and commissioning of new water treatment unit with capacity 120 m3 /hour for Well No. (12) at a cost of JD (950) thousands

Supply and install a new (CCTV) system for LPG Filling Stations (Amman & Irbid) at a cost of JD (320) thousands.

Modification on Firefighting system for crude oil receiving station at refinery site by construction of above ground firefighting pipe lines at an estimated cost of JD (265) thousands.

Purchase of (10) radar gauge system for storage tanks at a cost of JD (250) thousands.

Modification on Firefighting system for crude oil receiving station and Jet fuel filters at refinery site at an estimated cost of JD (250) thousands.

Supply of (2) Inter–Stage Condensate pumps for FCC unit at a cost of JD (250) thousands.

Rehabilitate the drainage networks in the refinery units to accommodate firefighting water and replace damaged concrete slabs (third phase) in the chemical treatment unit at a cost of JD (180) thousand.

Installation of new unloading station for Euro-5 Diesel at cost of JD (160) thousand.

Purchasing of (4) inspection devices for refinery units at a cost of JD (110) thousand.

 Purchasing of (35) temperature gauge systems for storage tanks at cost of JD (150) thousand.

Supply a new hydrostatic test machine for LPG cylinders (Capacity 12.5 KG) at a cost of JD (100) thousands.

 Purchase a new (5) pickups vehicles at cost of JD (100) thousands.

Supply of (2) LCO Circulation pumps for FCC unit at a cost of JD (100) thousands.

 Replacement of Diesel Cycle Oil tank at a cost of JD (100) thousands.

Purchasing (4) eclectic motors (400 V) and its control panels with VSD at cost of JD (85) thousands.

 Installation of (4) elevators for residential area at cost of JD (80) thousands.

 Purchasing humidity measuring device for circulating gas in platforming unit at cost of JD (70) thousands.

Supply and installation a new water spray washing machines (Capacity 12.5 Kg) for Amman LPG Filling Station at a cost of JD (70) thousands.

Installation of firefighting system in loading area department offices at cost of JD (50) thousand.

Installation of store for chemicals at cost of JD (40) thousands